Home / Services / Deck installation

DECK INSTALLATION.

Trex, TimberTech, and cedar decks machine-augered to 42-inch frost footings. Hurricane clips, concealed fasteners, and integrated railings built for upstate seasons.

Deck installation
EVERY DECK INCLUDES

42" frost-depth concrete footings poured commercial piers deep below frost line so your deck never heaves.

#1 structural ground-contact framing Simpson Strong-Tie hurricane hardware and structural screws throughout.

Hidden fastener decking systems clean surface without visible screws; seamless perimeter picture framing.

Code-compliant railings & post caps sturdy black aluminum balusters with optional low-voltage LED accents.

Good to know

4–8 days

Typical build, weather allowing

Fixed quote

One written number before we build

Financing

Monthly payments on custom decks — how it works →

Before Deck installation
Before — weathered 20-year-old splintering wood deck
After Deck installation
After — two-tier Trex composite deck with integrated stairs, Williamsville NY
DECK QUESTIONS
How much does a new composite or cedar deck cost?

Pressure-treated cedar decks typically range from $35 to $55 per square foot, while low-maintenance composite decks (Trex, TimberTech) range from $65 to $110 per square foot installed with framing, footings, and railings.

How deep do deck footings need to be in Buffalo and Rochester?

Upstate New York building codes require frost footings to be at least 42 inches below grade. Stoneleaf machine-augers concrete pier footings to 42–48 inches to ensure zero frost-heave or seasonal settling.

Do I need a building permit to replace or build a deck?

Yes, virtually every municipality in Western NY requires a building permit for attached or elevated decks. Stoneleaf draws the framing plans, submits to the town building department, and schedules all building inspections.

Built on 42-inch footings.

Decks made for upstate seasons.