STONELEAF
Turn a mud pit into an instant emerald lawn in 24 hours. Machine tilling, screened topsoil laser grading, and farm-fresh Kentucky Bluegrass harvested under 24 hours.

4–6" mechanical rotary tilling loosens compacted WNY clay so roots establish deep in 14 days.
Screened organic loam topsoil laser-leveled topsoil base eliminates bumps, dips, and water pooling.
Farm-fresh upstate sod rolls Kentucky Bluegrass cut less than 24 hours prior to placement.
Staggered seaming & drum roller packed with heavy water-drum rollers to eliminate air pockets.
1–2 days
Complete lawn transformation
Fixed quote
One written price including all dirt work
100% rooted
Full establishment guarantee with care plan


Complete turnkey sod installation typically costs $1.25 to $2.20 per square foot, which includes old lawn removal, mechanical tilling, screened organic topsoil leveling, fresh farm sod, and roller compaction.
Keep foot traffic to an absolute minimum for the first 14 days while new roots anchor into the topsoil. After your first mowing at day 14–18, normal foot traffic and pets can safely enjoy the lawn.
For the first two weeks, water twice daily (early morning and late afternoon) for 20–30 minutes per zone to keep the sod rolls and underlying soil consistently moist without pooling.