Home / Services / Sod installation

SOD INSTALLATION.

Turn a mud pit into an instant emerald lawn in 24 hours. Machine tilling, screened topsoil laser grading, and farm-fresh Kentucky Bluegrass harvested under 24 hours.

Sod installation
EVERY SOD JOB INCLUDES

4–6" mechanical rotary tilling loosens compacted WNY clay so roots establish deep in 14 days.

Screened organic loam topsoil laser-leveled topsoil base eliminates bumps, dips, and water pooling.

Farm-fresh upstate sod rolls Kentucky Bluegrass cut less than 24 hours prior to placement.

Staggered seaming & drum roller packed with heavy water-drum rollers to eliminate air pockets.

Good to know

1–2 days

Complete lawn transformation

Fixed quote

One written price including all dirt work

100% rooted

Full establishment guarantee with care plan

Before Sod installation
Before — compacted construction mud and bare patches
After Sod installation
After — 8,500 sq ft instant Kentucky Bluegrass lawn, Buffalo NY
SOD QUESTIONS
How much does professional sod installation cost?

Complete turnkey sod installation typically costs $1.25 to $2.20 per square foot, which includes old lawn removal, mechanical tilling, screened organic topsoil leveling, fresh farm sod, and roller compaction.

When can I walk on newly installed sod?

Keep foot traffic to an absolute minimum for the first 14 days while new roots anchor into the topsoil. After your first mowing at day 14–18, normal foot traffic and pets can safely enjoy the lawn.

How often do I need to water new sod?

For the first two weeks, water twice daily (early morning and late afternoon) for 20–30 minutes per zone to keep the sod rolls and underlying soil consistently moist without pooling.

Green grass in 24 hours.

Zero mud. Farm-fresh sod.